The Long Philip Burn

This cell is covered by Works Sections 26 to 35 as shown in the map below. 

The Work Sections are as follows: 

• Work Section 26 – Corby Linn Overflow and Bridge Remediation
• Work Section 27 – Corby Linn Ramp, Flume, Wall & footbridge
• Work Section 28 – LPB Restoration West • Work Section 29 – Angle’s Field North Embankment
• Work Section 30 – Angle’s Field South Embankment
• Work Section 31 – A707 Bridge Replacement
• Work Section 32 – LPB Restoration East
• Work Section 33 – Allotments Embankment
• Work Section 34 – Book Donors Wall & Footbridges
• Work Section 35 – Book Donor Embankment